No Project Name Project Location Installed Capacity
(MW)
Interest
(%)
Attributable Installed Capacity
(MW)
Projects in Operation
1 Phase I of Gansu Wuwei Project Gansu Province 20 100 20
2 Phase II of Gansu Wuwei Project Gansu Province 30 100 30
3 Phase I of Gansu Baiyin Project Gansu Province 20 100 20
4 Phase II of Gansu Baiyin Project Gansu Province 30 100 30
5 Phase III of Gansu Baiyin Power Project Gansu Province 15 100 15
6 Gansu Guazhou Project Gansu Province 8 100 8
7 Hainan Changjiang Project Hainan Province 20 100 20
8 Yunnan Yuanjiang Project Yunnan Province 20 100 20
Projects under Construction
9 Heilongjiang Tailai Project Heilongjiang Province 20 100 20
10 Jiangxi Ji’an Project Jiangxi Province 10 70 7
11 Jiangxi Xiajiang Project Jiangxi Province 20 70 14
12 Zhejiang Yunhe Project Zhejiang Province 15 60 9
13 Sichuan Panzhihua Project Sichuan Province 50 100 50
14 Fujian Zhangpu Project Fujian Province 46 100 46

As of 31 December 2016, the Group’s controlled installed capacity of photovoltaic power in operation was 253.23MW with annual power generation of 279,232.6MWh, representing an increase of 59.5% when compared to last year. The increase in power generation of the segment was primarily due to the additional power contributed by the commencement of operation of Phase III of Gansu Baiyin Project (with capacity of 15.0MW), Gansu Guazhou Project (with capacity of 8.0MW), Fujian Zhangpu Project (with capacity of 35.8MW) and Sichuan Panzhihua Project (with capacity of 34.32MW). Meanwhile, the Group’s Phase I of Wuwei Project and Phase I of Baiyin Project are concession projects and, therefore, not subject to curtailments. The percentage of curtailments of the Group’s photovoltaic projects was 7.6%, representing an improvement when compared to last year. During the year, the power generation of the segment accounted for 2.7% of the Group’s total power generation. The current capacity under construction of the segment is 86.64MW.