No Project Name Project Location Installed Capacity
(MW)
Interest
(%)
Attributable Installed Capacity
(MW)
Projects in Operation
1 Phase I of Gansu Jiuquan Project Gansu Province 100.5 100 100.5
2 Phase II of Gansu Jiuquan Project Gansu Province 49.5 100 49.5
3 Phase III of Gansu Jiuquan Project Gansu Province 201 100 201
4 Phase IV of Gansu Jiuquan Project Gansu Province 100.5 100 100.5
5 Phase V of Gansu Jiuquan Project Gansu Province 20 100 20
6 Heilongjiang Hongqi Project Heilongjiang Province 49.5 100 49.5
7 Heilongjiang Hailang Project Heilongjiang Province 49.75 100 49.75
8 Jiangsu Dafeng Project Jiangsu Province 200.25 100 200.25
9 Inner Mongolia Chayou Zhongqi Project Inner Mongolia 49.5 100 49.5
10 No. 2 Gansu Anbei Project Gansu Province 400 100 400
11 No. 6 Gansu Anbei Project Gansu Province 201 100 201
12 German B"onen Project German 8 100 8
Projects under Construction
13 Phase II of Jiangsu Dafeng Project Jiangsu Province 100 100 100
14 Hubei Macheng Project Hubei Province 80 100 80

As of 31 December 2016, the Group’s controlled installed capacity of wind power in operation was 1,429.5MW with annual power generation of 1,825,145.94MWh, representing a decrease of 2.5% when compared to last year. The decrease in power generation in the segment was due to the fact that the Group’s wind power projects were located in the Northwest regions where strict wind curtailment was implemented (mainly Jiuquan area of Gansu), of which, the wind projects in Jiuquan area accounted for 75% of the Group’s total installed capacity of wind power in operation, which resulted in deficiency of grid capacity for consumption. During the year, the Group’s average utilisation hours of wind power were 1,275 hours, decreased by 31 hours year-on-year. However, the Group’s average utilisation hours of projects in Gansu were higher than the actual average utilisation hours in Gansu, reflecting the Group’s management capabilities under severe condition. The percentage of wind curtailments of the Group’s wind power projects was 42.7%, representing an improvement when compared to last year. During the year, the power generation of the segment accounted for 18.0% of the Group’s total power generation. The current capacity under construction of the segment was 180.0MW.

友情链接: